Hot Pepper Yoga
Share the Post:

Size: 3,555 SF
Project Description: For this design/build project, Willmeng constructed a large hot yoga studio, an unheated yoga studio, a juice bar with seating area, retail and gathering areas, private offices, restrooms with shower facilities, and a mechanical/storage/work room area. The hot yoga studio portion of the project is heated using a modulating gas fired furnace incorporating fresh, outside air. Separate humidification equipment injects controlled, steam humidity into the air supply. The air supply is purified with the use of ultraviolet light. All walls and ceiling are 10″ thick with 10″ of insulation. All wall and ceiling surfaces are moisture resistant, painted with epoxy paint. “Big Ass” ceiling fans provide ambience and additional air circulation. All lighting is cove recessed with multiple circuits and rheostat control. The flooring is a low VOC material particularly designed for high performance in a hot yoga studio. Granite counters are in the juice bar area and restrooms. Other than the two yoga studios, floors are a stained concrete finish; two Hot Pepper Yoga logos are featured within the stained floors. High, open, painted ceilings in the retail and juice bar areas, along with suspended drywall “clouds” create inspiring gathering spaces. Project was designed and constructed on an accelerated schedule to achieve a targeted grand opening date.
Architect:
HJH Architects

Related Posts

Industrial

Willmeng Breaks Ground on One of Arizona’s Largest Speculative Industrial Facilities

As demand for large-format industrial space continues to outpace supply ...
Read More →
MunicipalMunicipal & Fire SafetyMunicipal & Public Safety

Willmeng Breaks Ground on Fire Station No. 7 for Lake Havasu City

A new fire station, long in the works, is now ...
Read More →
Municipal

Mesa Police, Willmeng Host Event to Provide Updates on HQ Renovation

Willmeng Construction and the Mesa Police Department recently hosted an ...
Read More →
Community

Building Better Facilities for Those Who Serve: Willmeng’s Proud Partnership with Luke Air Force Base

At Willmeng Construction, we believe that our work goes far ...
Read More →
CultureStaff

Intern Class of 2026

Across Willmeng, teams are getting ready to welcome the next ...
Read More →
Safety

Why “Safety First” is a Culture, Not Just a Checklist at Willmeng

At Willmeng, we often say that our success is built ...
Read More →
Scroll to Top