55th Avenue and Roosevelt Street
Civil Infrastructure
ABOUT
Key Infrastructure Elements:
- 55th Ave: 0.5 mile of 3-lane Collector Roadway construction including wet and dry utilities. Also included 2,500 LF of 42” irrigation infrastructure.
- Roosevelt Street: 0.5 mile of 3-lane Arterial Roadway construction including wet and dry utilities.