Greenway Road and Connector Loop

Owner

City of Surprise
Civil Infrastructure

ABOUT

Key Infrastructure Elements:

  •  Title 34 CMAR Construction
  • 0.75 mile of Arterial Roadway construction including wet and dry utilities and significant irrigation and water infrastructure.
Scroll to Top