The largest local ice manufacturer desired to double their production capabilities. Work required occupied phase building expansion to minimize disruption to Ice King’s operations during construction. Willmeng facilitated the addition of two new ice machines and two new bagging lines. Work included complete replacement of the critical Reverse Osmosis equipment, addition of a new cooling tower and multiple condensers. Both loading docks were expanded while the plant was operational and a 4,000-square-foot cooler building was built to accommodate the new RO system. The project was coordinated to minimize downtime and get the bulk of the work done during Ice King’s low demand window.
Ice King Expansion
Related Posts
Reflecting on Willmeng’s Successful 2024 Summer Internship Program
September 7, 2024
As summer drew to a close, we at Willmeng looked ...
Read More →
A Busy and Impactful Summer: Willmeng’s Engagement in Key Conferences
September 7, 2024
Summer 2024 has been a season of vibrant activity and ...
Read More →
Arizona Corporation Commission and Its Vital Role in Shaping Public Policy and Regulating Utilities
August 22, 2024
The second discussion of the August Fence Post featured three ...
Read More →
Construction Pricing
August 22, 2024
Willmeng hosted the second in a series of Fence Post ...
Read More →
Mesa, Richärd Kennedy Architects, and the City of Mesa receive Prestigious Interior Design Award for Gateway Library
July 8, 2024
Mesa Gateway Library, which opens in the summer of 2025, ...
Read More →
The Willmeng Fence Post Kickoff
May 17, 2024
Willmeng created the Fence Post series to inform clients and ...
Read More →